|
Hydraulic
Tube Sleeving
After
years of hands-on experience in the industry, HydroPro, Inc. is proud
to offer BoilerPro, the new, proven system for completely sealing boiler
tubes the first time. Responding to the needs of our customers, this
tool represents a huge step forward in tube expansion technology.
The BoilerPro is
easy to use, requiring minimal training. This means that even inexperienced
personnel will have no trouble handling this equipment.
The BoilerPro tube
expansion system consists of an air driven power supply unit, a pull
cylinder unit with umbilical hose assembly, and the mandrel assembly
for the tube size being expanded.
Boiler tubes seal
completely the first time, even during re-tubing, with minimal wall
thinning to jeopardize the integrity of your tubes. Even leaky tubes
which have been rolled and re-rolled can be expanded by the BoilerPro,
reducing or even eliminating the leaks
Features
| • |
Approximately five seconds per tube
expansion time. |
| • |
Zero operator strain: all reaction force is absorbed
by the tool. |
| • |
Minimal wall thinning. Initial cost is competitive
to rollers, with a minimal per/tube cost thereafter. |
| • |
One mandrel accommodates 3/8" to 1¼" header
thickness. |
| • |
Tooling available to easily accommodate any standard
boiler tube diameter from 1.5" to 3". |
| • |
The option of flaring (or belling) the tube end
protruding from primary face of tube sheet. |
| • |
A variable width expansion zone within the tube
sheet. |
| • |
The ability to bulge or seal the tube at the secondary
face. |
| • |
The operations can be done simultaneously or independently
of each other at the users discretion. |
|
| To receive
more information about the above products, please call, fax, e-mail or use our Inquiries page |
 |
|
|